Problem

Due to high frequency of passing vessels the Client approached Geoseas to provide an effective solution that will ensure safety and protection for the swimmers.

Proposed solution

Geoseas Engineering team proposed a Single layer HAMMER 750 barrier with the total length of 160m. Proposed anchor solution was 2 Ton every 5 m length, approximate depth was 7m and the installation process took 7 working days.

Results

Conclusion

Installed barrier ensured safe swimming area for the hotel guests, reduced the wave impact, prevented jetski entry to the area. 