Problem

The Client approached Geoseas in order to reduce the impact of the waves that are generated by passing vessels. 

Proposed solution

Geoseas Engineering team proposed a Single layer HAMMER 750 barrier with the total length of 250m. Proposed anchor solution was 1 Ton every 5 m length, approximate depth was 5m and the installation process took 10 working days.

Results